My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012715
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0012715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:57:11 PM
Creation date
1/31/2020 2:43:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012715
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
655
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> coil vapor be extracted without fussing through the fully <br /> operational incinerator (ThOx) or catalytic reactor (CatOx) <br /> before discharge to the atmosphare. <br /> -� 2.5 PROCESS WEIGHT <br /> Preliminary extraction tests conducted on four of the five vapor <br /> extraction wells indicated Initial TPH concentrations ranging <br /> from 4,500 to 74,000 ppm. A 30-cfm vacuum pump was attached to <br /> each well individually, and vapor camples were collected during <br /> vacuum extraction every 15 minutes for up to 60 minutoc. In each <br /> well, TPH concentrations rose to a maximum and then began to <br /> decline. Becauces the SJCAPCD had limited total omissions of <br /> r hydrocarbons to 5 pounds in 24 hours, trusts were not continued <br /> for periods of time that would cause omissions to exceed the <br /> limit, given the high concentrations of hydrocarbons in the sail <br /> vapor. The test dPta are discussed in detail below in Section <br /> _ 2.8. <br /> Figura 5, outlining the material balances, also indicates process <br /> -- weights during operation. <br /> 2.6 FUELS AND BURNERS USED <br /> The ThOx incinerator unit will be fueled with natural gas. Under <br /> full operation, the ThOx requires a maximum of 6.5 cubic feet per <br /> minute at 2-5 prig for continued use. <br /> The pre-mix burner has two burner heads, each 4 inches in dia- <br /> meter, constructed of ceramic in a honeycomb shape. The burner <br /> units are constructed by King, Buck/Hasastech, and each has a <br /> rapacity range of 5-60 scfm. <br /> ---- - The <br /> -CatOx-and`VCU-both- operate-on-electricity,--The-CatOx- <br /> requires 230 volts, single phase, 25 amps, along with a 115-volt. <br /> 20-amp circuit for controls. The .VCU has a 5-hp drive motor and <br /> requires a 3-phase, 115--volt hookup. <br /> c52/91918/txt 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.