My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012717
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0012717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:01:45 PM
Creation date
1/31/2020 2:55:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012717
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> -a-ti <br /> r3 <br /> ClIevron U.S.A. Inc. <br /> Site :,,af()ty 111nn <br /> .luno 19, 1991 <br /> 10.0 PROJECT PERSONNEL <br /> Groundwater Technology, Inc. will overs+. 4nd act accordingly during <br /> all phases of the project. Tho following nanagersent utructuro will be <br /> inatituted Car r,he purpone Of NucceNsfully and notely conplcztirg thin <br /> project. <br /> 10.I kZ9j&V <br /> The Project Manager will be r0013005iblO for implementing the project <br /> and obtaining any naccu:;ary personnel or resources for the cor..plction <br /> of the project. Specific duties will include: <br /> coordinating the activities of all subcontractors, to include <br /> infhrequired personal <br /> them of <br /> acknowledgingprotective <br /> this iSite gSaft <br /> cty <br /> Plan (see Appendix A) , <br /> ♦ selecting a Site Safety officer and field personnel for the <br /> word: to be undertaken on site, <br /> ensuring that the tanks assigned are being completed as planned <br /> and on schedule, <br /> ♦ providing authority and resources to ensure that the Site <br /> Safety Officer i, able to imple^ent and Swanage safetY <br /> procedures, <br /> • preparing reports and recommendations about the project to <br /> cliontss and affected Groundwater Technology, Inc. personnel, <br /> t ensuring that persons allowed to enter the site (i.e. , EPA, <br /> contractors, state officials, visitors) are taade aware of the <br /> potential hazards associated with the substances known or <br /> suspected to beon sit , and are k owledgfety plane an to the <br /> on-site copyspecific <br /> s ensuring that the Site Safety officer is aware of all of the <br /> provisions of this site safety plan and is instructing all <br /> personnel on site about the safety practices and emergency <br /> procedures defined in the plan, and <br /> ♦ ensuring that the Site Safety officer in :.inking an effort to <br /> monitor site safety, and has dcsgnated a Field Team Leader to <br /> assist with the responsibility when necessary. <br /> 2 a <br />
The URL can be used to link to this page
Your browser does not support the video tag.