Laserfiche WebLink
b. SCHEDULE <br /> EA can begin borehole drilling within two weeks of receiving authorization from Chevron and <br /> the San Joaquin County Department of Environmental Health,assuming driller availability. <br /> it is anticipated that the well will require two days to install. Well development will require 2-4 <br /> hours and will be conducted prior to well sampftergreceiptt of samples.pling of the The finalrequire <br /> report will be <br /> Laboratory analysis will require three weeks a p <br /> delivered three weeks after receipt of analytical results. <br /> E <br /> lu <br /> - c70N191Btx1 - - <br />