Laserfiche WebLink
, <br /> APPENDIX A <br /> PROTOCOLS FOR WELL DRILLING,COMPLETION, <br /> DEVELOPMENT,AND SAMPLING <br /> A.1 DRILLING <br /> The boreholes are drilled with a truck-mounted rotary drill using 10-inch outside diameter <br /> hollow-stem,continuous-flight augers. The borehole is drilled 10 feet below static water but will <br /> not penetrate competent clay iayers that may act as effective aquitards. Drilling is terminated <br /> after two consecutive sampling intervals intersect comparable, apparently impermeable clays <br /> below static water. Casing and sand are installed inside the inner opening as the augers are <br /> gradually removed. <br /> All augers, sampling rods, samplers, and downhole equipment are steam cleaned before drilling <br /> and fluids and between each new well. All drill cuttingsa labeled withr the borehole om steam cleaning <br /> umber ,site descrip- <br /> onsite in sealed 55-gallon drums. The drums ar <br /> tion(including owner's name),depth interval of soil contents,date,and monitoring equipment <br /> readings. The drill cuttings are disposed of at proper facilities on the basis of soil sample analy- <br /> sis. <br /> A log of drilling and the borehole are recorded by an EA geologist overseeing the drilling opera- <br /> tions and well installation. The boring logs are signed and dated and contain detailed geologic <br /> information,including descriptions of the soils classified according to the Unified Soil Classifi- <br /> cation System,blow counts,OVA readings,moisture content of the soils, and initial and static <br /> water levels. <br /> A.2 SOIL SAMPLING <br /> Soil samples are collected at 5-foot intervals and at any substantial changes of soil type,begin- <br /> ning at 5 feet below ground surface,with a 2-inch-diameter, I8-inch modified California sple <br /> spoon sampler containing three 6-inch brass liners. The sampler and liners are steam cleaned <br /> before Use in each hole; they are scrubbed in deionized water and Alconox detergent and rinsed <br /> with deionized water after use at each sampling interval. Soil samples are collected to a total <br /> depth of the borehole unless heaving sand occurs. Every attempt is made to collect a soil sample <br /> just above or at the water table. <br /> At each sample depth, the drive sampler is driven 18 inches ahead of the drill augers into undis- <br /> turbed soil. Typically after the sampler is opened,either the lowermost or middle sample liner is <br /> retrieved,and the ends of the tube covered with aluminum foil and sealed with plastic caps. The <br /> plastic caps are secured to the liner with tape. The soil-filled-liner is-labeled with the location, <br /> A-1 <br /> - s]C9l9,Yp <br />