My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002653
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0002653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 4:29:55 PM
Creation date
1/31/2020 3:04:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002653
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n(� Drilling Log <br /> GROUNDWATER Monitoring — <br /> �LJ❑ TECHNOLOGY Well MW ii <br /> Project Chevron/E Hardino Owner Chevron USA Products Co <br /> Location Stockton Ca Project No 02320-2672 Date drilled 05111/92 <br /> 1- p1->. h <br /> L.-. O r-, C U h <br /> oQ oo �, Description <br /> ao <br /> n" E a° E a �� N (Calor, Texture, Structure) <br /> Lj EDX j Trace < 10%, Little 10% to 20%. Some 20% to 35%, And 35% to 50% <br /> - 561 s E Dark brown sandy clayey SILT (continued) <br /> 56 <br /> (grades brown clayey SILT) <br /> 60 ML <br /> 0 !s <br /> L 1e Encountered groundwater at 610 feet on 05/11/92 <br /> 18 <br /> 62 <br /> Brown silty CLAY <br /> 64 <br /> = 0 is <br /> �6 M 27 <br /> — 32 <br /> 68 — <br /> CL <br /> - 70 - = 0 is <br /> N 38 <br /> 25 <br /> - 72 — . = (grades with minor fine sand) <br /> 74 <br /> 76 - - --�_� <br /> End of boring at 75 0 feet Installed groundwater monitoring well <br /> 7$ <br /> 80 <br /> 62 <br /> • 84 <br /> 86 <br /> 88 <br /> 07/20/1392 1;l Hog—mar 92 <br /> _Page 3 of 3 __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.