Laserfiche WebLink
CHEVRON WELL MONITORING DATA SHEET <br /> -� - -Project #: r f '� r Station #' '7 9 <br /> Start Date: <br /> Well I Dr. • w _ Well Diameter (circle one) 2 3 6 <br /> Total Well Depth: Depth to Water* <br /> Before7 qc After Before 34116 <br /> After <br /> Depth to Free Product Thickness of Free Product (feet) " <br /> Measurements referenced to PVC Grade Other: <br /> Well Diameter 0 F Well Diameter VC..F <br /> 111 211 16 ,1 2.61 <br /> 344 4" 0 65 12 "5 87 <br /> 5" 1 02 16" 10.43 <br /> X <br /> 1 Case Volume Specified Volumes -. gallons <br /> Purging Bailer Sampling Bailer <br /> Disposable Bailer,-- Disposable Baxler---' <br /> Middleburg Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> TIME EE4P pH GOND TURBIDITY VVOLUMED OBSERVATIONS <br /> �Z7. <br /> _ Zia <br /> b!5 71 Z <br /> Did Well Dewater? If yes, gals. Gallons Actually Evacuated: <br /> Sampling Time Sampling Date. G <br /> Sample I D. : Laboratory <br /> Analyzed for: H- BTE TPH-D OTHER: <br /> (Circle) b (D5U <br /> • Duplicate I.D Cleaning Blank I.D. : <br /> Analyzed for: TPH-G BTEX TPH-D OTHER: <br /> (Circle) <br /> i <br />