Laserfiche WebLink
• <br /> • i <br /> 0MW14 <br /> ASPHLT <br /> PHA <br /> t- <br /> EXISTING <br /> BUILDING <br /> 0 MW 10 <br /> LEGENb <br /> SB-4 MW 110 MW 12 • <br /> FORMER USED MW-8® MW-'2 0 GROUNDWATER MONITORING WELL LOCATION <br /> OIL TANK AND DESIGNATION <br /> (INSTALLED 1984) r- Uj <br /> , <br /> SB 5 0 = V',&EXISTING SOIL VAPOR EXTRACTION WELL <br /> _) sa-6 Z LOCATION AND DESIGNATION <br /> EXISTING /z,*S8-7 FORMER PRODUCT t�� ; > MW 20 DESTROYED WELL LOCATION AND DESIGNATION <br /> BUILDING FORMER MW 30 ISLA Q SB-5 0 SOIL BORING LOCATTON AND DESIGNATION <br /> `� + <br /> STATION 0 <br /> BUILDING V-4A S81 as Mw S&10❑ XSOIL BORING LOCATION AND DESIGNATION <br /> + ------ '1+ Se MW 13 e Q (LOCATION APPROXIMATE) <br /> Ai SS-1 <br /> 82 Mw 9®` A V I O A' LINE OF GEOLOGIC CROSS SECTION <br /> g V�S&I REMEDIAL ZONE ❑ <br /> Mw1a+ Sell _!SMW5 <br /> i J <br /> J + <br /> FORMER UNDERGROUND + __ __ � B9 LLI <br /> FUEL STORAGE TANK 4b V-2 MW-2R• 1-4-1 NOTE <br /> COMPLEX(INSTALLED 1984) --- <br /> !a Mw 2 <br /> 1 UNDERGROUND STORAGE TANKS LOCATED <br /> DURING FIELD WORK 11188 and 12193 <br /> FORMER PRODUCT 2 UNDERGROUND STORAGE TANKS ON HISTORIC <br /> ~ISLAND FACILITY PLANS <br /> EAST HARDING WAY <br /> NOTE CROSS SECTIONS MODIFIED FROM EA ENGINEERING SCIENCE <br /> AND TECHNOLOGY INC CROSS-SECTIONS DATED MARCH 1989 <br /> PACIFICFORMER CHEVRON U S.A SERVICE STATION 9-1918 <br /> ENVIROSCALE 45 East Harding Way at EI Dorado Avenue FIGURE <br /> GROUP INGNTAL Stockton,California 3 <br /> 0 30 60 FEET PROJECT <br /> GEOLOGIC CROSS-SECTION MAP 320-13338 <br />