My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002665
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0002665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 4:52:17 PM
Creation date
1/31/2020 3:28:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002665
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 27, 1995 <br /> Page 5 <br /> General System Design <br /> PACIFIC proposes to address hydrocarbon mass reduction (vadose, capillary fnnge, and <br /> saturated zones)through a combination of SVE, air sparging, and enhanced biodegrada- <br /> tion The proposed remedial program would consist of the following elements <br /> • Continued quarterly groundwater monitoring and sampling <br /> • Installation of proposed Wells VW-1, VW-2, VW-3, S-1, and S-2 <br /> • Short term (approximately 6 months) SVE from proposed <br /> Wells VW-1, VW-2, and VW-3 (Figure 6), and air sparging in <br /> proposed Wells S-1 and S-2 for bulk hydrocarbon mass removal <br /> • Perform biodegradation assessment and mapping of dissolved oxygen, <br /> nitrates, phosphates, and sulfates at scheduled intervals during the <br /> application of SVE and air spargmg Measure and record the above <br /> parameters and oxygen and carbon dioxide levels in soil vapor from <br /> remediation system wells before and after SVE <br /> • Upon conclusion of SVE, review additional biodegradation assessment <br /> data, evaluate biodegradation parameters and determine possible <br /> . applicability of biodegradation based technologies to address residual <br /> on-site hydrocarbon impact (e g , low flow air injection, ORC, or <br /> hydrogen peroxide injection) <br /> • Enhanced biodegradation through oxygen injection into Well S-1 and <br /> S-2 <br /> The SVE/air sparging system is shown on Figure 6 General design subtasks will <br /> include specifying transport piping layout and construction requirements, specifying <br /> extraction well requirements, detailing equipment compound layout and construction <br /> requirements, defining electrical power distribution and systems control requirements, <br /> and sizing equipment A set of construction drawings will be generated to facilitate the <br /> move from design to construction and allow the acquisition of a building permit The <br /> design will comply with all relevant electnc, building, and fire codes <br /> In general, the system design will allow application of SVE and air sparging for bulk <br /> hydrocarbon removal and biodegradation Initially, piping will be placed aboveground <br /> surface and will be constructed of polyvinylchloride ' <br /> Initially, the equipment compound will be placed in the location shown on Figure 6 The <br /> compound will be fenced to secure equipment and above-grade conduit Currently, <br /> plans for a Taco Bell restaurant are being reviewed by the City of Stockton Planning <br /> . Department for construction at the site Once these plans are approved, remediation <br /> system piping, well head connections, and equipment locations will be modified to <br /> 3201333BkVnWLN3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.