Laserfiche WebLink
CONTENTS <br /> 5 3 1 Elements Common to Alternatives 17 <br /> 5 3 2 Alternative 1 Soil Excavation and Air Sparging 18 <br /> 5 3 3 Alternative 2 Soil Vapor Extraction/Bioventing and <br /> Air Sparging 18 <br /> 5 4 Alternative Evaluation 19 <br /> 6.0 IMPLEMENTATION SCHEDULE 22 <br /> REFERENCES <br /> APPENDIX A PREVIOUS INVESTIGATION SUMMARY <br /> APPENDIX B TECHNOLOGICAL LIMITS OF GROUNDWATER <br /> REMEDIATION: A STATISTICAL EVALUATION METHOD <br /> APPENDIX C CHEVRON MEMORANDUM DATED OCTOBER 21, 1994 <br /> APPENDIX D ALTERNATIVE ANALYSIS: ASSUMPTIONS, <br /> CONDITIONS, AND CALCULATIONS <br />