My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002669
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0002669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:11:03 PM
Creation date
1/31/2020 3:30:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002669
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
quarterly <br /> R-1 annually <br /> MW-3* quarterly <br /> *denotes Boundary Well <br /> H Observati ne and Teet icedures <br /> 1 The groundwater well observations for all wells shall consist of the following_ <br /> a Water elevation reported to the nearest 0.01 foot for both depth to water from the ground <br /> surface and the elevation of the groundwater level; <br /> b. Groundwater temperature measured at the time of sampling and reported in degrees <br /> Fahrenheit; <br /> c Groundwater conductivity measured at the time of sampling as per Standard Methods 205 <br /> using potentiometric methodology, <br /> d. Groundwater pH measured at the time of sampling as per Standard Methods 423 using <br /> potentiometric methodology, and, <br /> e. Groundwater turbidity measured at the time of sampling. <br /> 2. The test procedures for the groundwater samples taken from all wells shall be as described <br /> herein <br /> a. Volatile organic compounds by EPA Method 8010. <br /> b. Detection limits shall be adequate for determining compliance with cleanup standards <br /> e if the analyses confirm increases), the dischargers must provide verbal notice within 72 <br /> hours and written notice within 7 dais of the date of such confirmation, to the Regional <br /> Board <br /> f Within 15 days after receiving written notification from the Board, the dischargers must <br /> implement a contingency plan and within 90 days following notification must begin <br /> groundwater extraction, implementation and extraction willcontinue until confirmed <br /> groundwater analyses indicate a return to pre-existing conditions Groundwater <br /> monitoring/sampling and analyses will be accelerated according to a plan proposed to and <br /> approved by the Board Executive Officer within 30 days after written notification firstreceived by the dischargers <br /> SMP-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.