Laserfiche WebLink
JA) w <br /> 3 The project lifespan of continuous soil vapor extraction(SVE)utilizing an internal <br /> combustion engine both as a vacuum source and a vapor abatement source is <br /> 6 months The lifespan of low flow, pulsed bloventmg is 2 years <br /> Capital <br /> ti <br /> • System Design and Remediation $15,000 <br /> Permitting <br /> • System Construction, Installation, $40,000 <br /> and Permitting <br /> • Well Installation (3 SVE Wells) $10,000 <br /> • Capital Equipment $50,000 <br /> • Project Status Reporting $3,000 <br /> During Implementation <br /> Capital Subtotal $118,000 <br /> Annual Costs <br /> • Groundwater Monitoring $4,100/year <br /> (8 year life) <br /> • Operation and Maintenance <br /> Year 1 $45,000 <br /> Years 2 and 3 $10,000/year <br /> • Utility Costs <br /> Year 1 $30,000 <br /> Years 2 and 3 $5,000/year <br /> Present Worth <br /> • Groundwater Monitoring $23,561 <br /> ($4,100)(5 7466) <br /> 3201337B/1918REV C - 4 August 31, 1995 <br />