My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002671
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0002671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 4:46:14 PM
Creation date
1/31/2020 3:34:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002671
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLAINS TIMOTHY [)RIVE <br /> r SAN JOSE, CA 95133 <br /> ��'7�+'►►��**���'/�t� (408)995-5535 <br /> R _ ; TECH t VGA[-'1�Y'JW/ INC -8773(408)293 8773 <br /> �5 r <br /> APit 1 `t? PO 2. Z 1 <br /> March 9, 1995 <br /> Brett Hunter �3 b <br /> Chevron U S A Products Company <br /> 2410 Camino Ramon <br /> San Ramon, CA 94583-0804 <br /> Ld Quarter 1995 Mori ming at 9-1918 <br /> Fust Quarter 1995 Groundwater Monitoring at <br /> Chevron Service Station Number 9-1918 <br /> 45 East Harding Way <br /> Strackwit,C <br /> Monitoring Performed on January 23, 1995 <br /> Groundwater Sampling Report 950123-G-1 <br /> This report covers the routine quarterly monitoring of groundwater wells at this Chevron facility. <br /> Blaine Tech Services, Inc 's work at the site includes inspection, gauging, evacuation, <br /> purgewater containment, sample collection and sample handling in accordance with standard <br /> procedures that conform to Regional Water Quality Control Board requirements <br /> Routine field data collection includes depth to water, total well depth, thickness of any separate <br /> immiscible layer, water column volume,calculated volume of a three-case vaUme purge. <br /> elapsed evacuation time, total volume of water removed, and standard water parameter <br /> instrument readings Sample material is collected,contained, stored, and transported to the <br /> laboratory in conformance with EPA standards Purgewater is, likewise,collected and <br /> transported to Chevron's Richmond Refinery for disposal <br /> Basic field information is presented alongside analytical values excerpted from the laboratory <br /> report in the cumulative table of WELL DATA AND ANALYTICAL RESULTS The full <br /> analytical report for the most recent samples is located in the Analytical Appendix The table <br /> also contains new groundwater elevation calculations taken from the computer plotted gradient <br /> map which is located in the Professional Engineering Appendix <br /> Blaine Tech Services, Inc Report No 950123-G-1 1 St 0-1995 Monitoring at Chevron 9-1918 <br />
The URL can be used to link to this page
Your browser does not support the video tag.