Laserfiche WebLink
1 l <br /> 45 East Harding Way, Stockton, California July 22. 1992 <br /> . Chevron U S A Products Company Page i <br /> TABLE OF CONTENTS <br /> 1 0 INTRODUCTION 1 <br /> 2.0 BACKGROUND 2 <br /> 2 1 Quarterly Groundwater Monitoring and Sampling 3 <br /> 3 0 SCOPE OF WORK 4 <br /> I <br /> 3 1 Site-Specific Health and Safety Plan/Background Review/Permitting 4 <br /> 32 Soil Borings 4 <br /> 33 Soil Sampling 4 <br /> 3 4 Monitoring/Vapor Extraction Well Installation 5 <br /> 3 5 Monitoring Well Development 5 <br /> 3 6 Groundwater Monitoring 6 <br /> 3 7 Groundwater Sampling 6 <br /> 4 0 SITE CONDITIONS 7 <br /> 4 1 Hydrogeology 7 <br /> 42 Results of Soil Analyses 7 <br /> 43 Results of Groundwater Analyses 7 <br /> LIST OF FIGURES <br /> FIGURE 1 - SITE LOCATION MAP <br /> FIGURE 2 - SITE PLAN <br /> FIGURE 3 - POTENTIOMETRIC SURFACE MAP <br /> LIST OF TABLES <br /> TABLE 1 - RESULTS OF SOIL SAMPLE ANALYSES <br /> TABLE 2 - GROUNDWATER ANALYTICAL RESULTS AND MONITORING DATA <br /> d.7:C] GROUNDWATER <br /> TECHNOLOGY <br />