Laserfiche WebLink
- PROJECT NUMBER WELLNUMBER <br /> - 144002.KP.35 KP-8S SHEET 1 OF i <br /> WELL COMPLETION DIAGRAM <br /> PROJECT: Koppel Stockton Terminal LOCATION: 30 If N of E-W or Burlington Northam&Santa Fe Line__ <br /> DRILLING CONTRACTOR. Spectrum Exploration <br /> DRILLING METH OD AND EQUIPMENT USED: Hollow Stem Auger-CME 75 <br /> WATER LEVELS: -5 Or msl (7/13/99) START: 3:30 p.m.4/27/99 END: 5:15 p.m. LOGGER: Paxton <br /> 4" <br /> 3 <br /> 3b 2 1 1-Ground elevation at well 3.4t'msl <br /> 2-Top of casing elevation 3.01'msl <br /> 3a— 3-Wellhead protection cover type 10"christie box <br /> a)drain tube? NA <br /> b)concrete pad dimensions 18" <br /> 8 5 <br /> i4-Dia./type of well rasing 4"sch.40 PVC casing <br /> 5-Type/slot size of screen 4"sch.40 PVC,0.020"slot size <br /> 7 <br /> 22' 6-Type screen filler No.3 Sand(8 x 20 sieve) <br /> q • a)Quantity used 8 bags <br /> 7-Type of seal 3/8"Bentonite pellets <br /> a)Quantity used 75 lbs. <br /> • 8-Grout <br /> a)Grout mix used Cement-bentonite grout mixture <br /> b)Method of placement Pour-shallow <br /> c)Vol.of well casing grout 6 cubic R. <br /> Development method Surge bail&pump <br /> 10' • <br /> Development time 1.75 hours <br /> Estimated purge volume 150 gallons <br /> Comments Drilled to 22 feet Surged 15 minutes bailed to 22 feet Surged 15 minutes bailed 30 gallons. <br /> Flow rate during development=1.7 qpm and water table while <br /> pumping=1510 16 feet below lop of casing.Final lurbitl Rv=801510 16 feet below lop of casing.Final lurbidttv=80. <br /> H <br /> 10.75" <br /> ODIMpro12\144002\welldiagramsl\KPES <br />