My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
ARCHIVED REPORTS_REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:13:09 PM
Creation date
1/31/2020 3:55:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REPORTS
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> Contents <br /> • <br /> Page <br /> Section <br /> • <br /> • Acronyms and Abbreviations.......................................................................................................vii <br /> • 1 Introduction.........................................................................................................................1-1 <br /> • 1.1 Objectives.................................................................................................................1-1 <br /> 1.2 Report Organization..............................................................................................1-2 <br /> 2 Background..........................................................................................................................2-1 <br /> 3 Report Requirements.........................................................................................................3-1 <br /> • 4 Activities Completed during the Reporting Period.....................................................4-1 <br /> 4.1 Groundwater Sampling.........................................................................................4-1 <br /> • 4.2 Annual Tree Survey...............................................................................................4-2 <br /> • 4.3 Ten-year Evaluation Soil Sampling......................................................................4-2 <br /> • 4.4 Former Bagging Plant Soil and Groundwater Investigation............................4-2 <br /> • 5 Results..................................................................................................................................5-1 <br /> 5.1 Annual Groundwater Monitoring.......................................................................5-1 <br /> 5.1.1 Video Survey of Monitoring Well KP-3.................................................5-1 <br /> • 5.1.2 Groundwater Levels.................................................................................5-1 <br /> 5.1.3 Groundwater Quality...............................................................................5-2 <br /> • 5.2 Soil Sampling Results.............................................................................................5-7 <br /> • 5.2.1 Ten-year Soil Sampling Results...............................................................5-7 <br /> • 5.2.2 Former Bagging Plant Area Investigation...........................................5-12 <br /> • 6 Evaluation of Remedy Performance...............................................................................6-1 <br /> 6.1 Tree Health..............................................................................................................6-1 <br /> • 6.1.1 Overall Tree Health-Ten-year Review.................................................6-1 <br /> • 6.1.2 Original Test Grove-Annual Review...................................................6-2 <br /> • 6.1.3 Turnaround Area-Annual Review.......................................................6-3 <br /> 6.1.4 North of Warehouse Planting Location-Annual Review..................6-3 <br /> • 6.1.5 Former Bagging Plant-Annual Review................................................6-3 <br /> . 6.1.6 Stormwater Pond -Annual Review........................... 6-4 <br /> 6.2 Contaminant Reduction............................... ............................6-4 <br /> • 6.3 Former Bagging Plant Area..............--.................................................................6-6 <br /> • 6.3.1 Groundwater..............................................................................................6-6 <br /> • 6.3.2 Soil...............................................................................................................6-6 <br /> 7 Recommendations..............................................................................................................7-1 <br /> • 8 Works Cited.........................................................................................................................8-1 <br /> • <br /> • <br /> • RDD/112370001(CAH5003.DDCX) III <br /> rmez 1IU27 exnD <br /> • <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.