Laserfiche WebLink
Redding, CA 96001 <br /> • Sandra.Shearer@ch2m.com <br /> -----Original Message----- <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wednesday, October 17, 2007 8:16 AM <br /> TO: Shearer, Sandra/RDD <br /> Subject: RE: Koppel KP-11S <br /> I cannot confirm an appointment on a permit that has not been issued. However, I have <br /> reserved Oct 24 for this activity. <br /> Assuming you get me all the required items I need to issue the permit with enough time to <br /> actually process it all, that date will work. Please don't expect me to be the last item <br /> on your checklist and to meet your schedule if you do not provide me with the time I need <br /> to do my job. ALL the paperwork is to be on my desk NLT Friday, October 19, by 4pm. This <br /> is the latest time. . .earlier would be better. <br /> If later than Friday, or if items are missing or the application is incomplete, you may <br /> have to reschedule since I won't have time to process and issue the permit. <br /> As for my PPE, I will be in my truck outside of the safety/hot zone for the procedure. <br /> Plan on having some one either call in the details to me there relay the info/questions to <br /> me. I will not be suiting up in Level C or B and I will not be entering the <br /> controlled/restricted area during this process. <br /> There are many work plans and field appointments ahead of you. All of which have submitted <br /> their papers and fees when in advance of their scheduled field work. My priorities are <br /> with those who have anticipated delays and provided me with adequate time to issue. I will <br /> get to your work plan as time allows. <br /> Has Amy generated a work plan approval letter? If so I'll need to get a copy. If not, have <br /> her call me please. <br /> Michael Infurna <br /> SJCEHD <br /> (209) 468-3454. <br /> -----original Message----- <br /> From: Sandra.Shearer@CH2M.com [mailto:Sandra.Shearer@CH2M.com] <br /> Sent: Tuesday, October 16, 2007 7 :32 PM <br /> To: aterrell@waterboards.ca.gov; Mike Infurna [EH] <br /> Subject: RE: Koppel KP-11S <br /> Hi, Amy and Michael, <br /> Attached are the following documents in support of abandoning Monitoring Well KP-11S at <br /> the Koppel Stockton Terminal: <br /> 1. Statement of Work for CH2M HILL's subcontractor, Spectrum Exploration, detailing well <br /> destruction methodology 2. KP-11S Soil Boring Log 3. KP-11S Well Construction Diagram 4. <br /> site Map showing location of KP-11S <br /> KP-11S was damaged following the collapse of a warehouse operated by Headwaters Resources <br /> in early March 2007, and consequently KP-11S could not be sampled in March or August 2007 . <br /> In August 2007, the bottom of Well KP-11S was measured at a depth of 10.8 feet bgs. The <br /> total well depth following construction in July 2006 was 24 feet bgs, indicating this well <br /> is obstructed or partially filled with debris. Well KP-11S is scheduled to be abandoned <br /> next Wednesday, October 24 . <br /> Michael, please confirm that you are still available on October 24th to oversee well <br /> drilling and abandonment. You will need to have the PPE specified in the attached <br /> Statement of Work (Level C PPE) , including a full-face air-purifying respirator with Hepa <br /> filter cartridges (GME-H cartridges or equivalent) . Please confirm what additional <br /> paperwork or information you need, the total price for the permit, and the address for the <br /> check to be sent. <br /> 3 <br />