My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 0 Page 2 of 3 <br /> The signed approval letter from Mr. Weinberger for well installation at 2025 Hazelton Avenue is attached. <br /> Alexa <br /> From: Stamets, Alexa/BAO <br /> Sent: Tuesday, June 20, 2006 9:57 AM <br /> To: 'Mike Infurna [EH]' <br /> Cc: Hodson, David/BAO <br /> Subject: RE: groundwater monitor <br /> Mike, <br /> Thanks for the email regarding the Port of Stockton's approval for well installation. <br /> The attached figure shows the three proposed well locations. These are the same locations that were identified in <br /> the permit application. The locations have not changed since the permit application was submitted to you. <br /> I have sent Mr. Weinberger an email requesting that he sign the approval letter. I will forward the signed letter on <br /> to you when 1 receive it. <br /> I believe that we will have all the necessary components for the permit once we receive the signed letter from Mr. <br /> Weinberger. Please let me know if my understanding is wrong and is there is anything else we need before you <br /> issue the permit for this well installation. <br /> Thanks for your help, <br /> Alexa <br /> Alexa Stamets, P.E. <br /> CHN HILL <br /> 155 Grand Avenue,Suite 1000 <br /> Oakland,CA 94612 <br /> Direct:(510)587-7717 <br /> Cell:(530)949-7753 <br /> Fax:(510)622-9001 <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Tuesday, June 20, 2006 8:16 AM <br /> To: Stamets, Alexa/BAO <br /> Subject: RE: groundwater monitor <br /> I can not read a signature on the access agreement. Please re-send with the signature <br /> visible. <br /> Also, EH[) needs to be updated with the location of the well BEFORE the permit is <br /> issued. Please include a map showing the location of the well. <br /> From: Alexa.Stamets@CH2M.com [mailto:Alexa.Stamets@CH2M.com] <br /> Sent: Monday,June 19, 2006 4:42 PM <br /> To: Mike Infurna [EH] <br /> Cc: david.hodson@ch2m.com <br /> Subject: FW: groundwater monitor <br /> Mike, <br /> 6/27/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.