My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25S3o I5; Feb•24-00 <br /> 4:07Pt(; Page 314 <br /> W.Mn"ani L.Darbonio <br /> Page 2 24 February 2000 <br /> ia: 10 <br /> Cleanup goals proposed for groundwater Ave the Water Quality Qbjectives for nitrate and <br /> "i�,and is tnp,li amIIl0nI6, However,there is as published taste and odor threshold oconammonia <br /> f <br /> of 0.5 mgfI,sn this should be used instead. As I have disctused previously, the Primary cleanup goal <br /> wilt be the bavkgrcuud concentration for nitrate and ammonia, Side-gradient weds show uitratc as low <br /> as ane rngll and amnion a not dt:tec tom, If Koppel demonstrates that the background co <br /> cannot be met,then the water quality goal becomes the cleanup goad_ ncentration <br /> The RAP ProPo to obtain soil samples in, and at five year intervals. Eight subsampies will be <br /> propocomposited into one sample at each of three depots for each of tour separate planting areas. CH2M Hilt <br /> ses to analyze each composite sample for nitrate,ammonia and pH.Soil analyses should include <br /> otal Kjeldahl nitrogen{'I'If N). <br /> The RAP proposes to reduce mordtorin well sem tin <br /> t+fr.Vogt during our 23 FebruaryZ t; P g fiction,I it saveannually. As I di(wussed with <br /> 199 telephone conversation,atioq I will review this request in 6eparate <br /> vonrspondcnee when 1 review do 1499 Annual Report. <br /> The RAP also requested eliminating the groundwater monitoring requucment forTTGAf analyses and <br /> total dissolved solids(TpS). As the RAP notes,the monitoring rccctd shows that KN identified d <br /> site wasists of ammonia,not ozganicnitrogen,and the IDS information can be irrferiod from tho <br /> electrical conductivity data that's regularly collected during monitoring events. In our 23 February <br /> even excluding <br /> Mr.Vogt and d that he would proceed as usual with the first civartcr monitoring <br /> event,excluding the Second <br /> q and TITS a. -Wes, and we will both work to implement any changes to the <br /> seheduIc for the second quarter event. <br /> he <br /> The:RAP proposes fit at ye evaluation <br /> 10 to occur it year all=following initialplantigg,with ttubsequent <br /> evaluations g year 5,year 10 and year 1 S. <br /> analyze the impact that the h Y At the fust throe-year evaluation,CH2M Hill wil l <br /> evaluations will also include the impact on oil constituents.on has had on water quality,and the fjye year <br /> In order to insan rho initial activities into the record,Please submit a brief letter report he r <br /> completion of initial activities. This should include a table of soil sampling results,dates of plantingstuzurrarizing s <br /> variety of trees,any deviations from the work plan.and any other details that should be in the record. <br /> CH2M Hill originally submitted this RAP as a I?raft. Hawevcras no other changes are necessary to <br /> convert this document to a fwal,Mr. Vogt provided a replaccsa;of cover <br /> Remedial Action Plan into a Final Remedial Action plan pogo that changes the Drag <br /> 'Me Remedial Action plan is approved subjw to too following conditions: <br /> 1• The nd arary goaib shallgroundwater cleanup goals shall be one mgtf nitrate and non-detectable ammonia. The <br /> as nitrogen.g sal a water quality goals of 10 mS4 nitrate as nitrogen,and 06 ml;A ammonia <br /> 2. Solt analyses shall include T1QJ in addition to nitrate,ammonia, and pH. <br /> According the schedule in the RAP,CHZM Hill will sample soils on approximately S tvl:uch weather <br /> Permitting, A short letterre port smnmerizing the planting activities shall be duo concurrently With the <br /> second quarterly tnonitotingreportwhich is due 30 Jaly 20410. The subsequent evaluations maybe <br /> combined with Ura Annual Monitoring Reports. The third year evaluation will he elite 30 Jannary 2004, <br /> the fifth year evaluation will be due 30 January 2006,the tcn_year evaluation will be due 30 January <br />
The URL can be used to link to this page
Your browser does not support the video tag.