Laserfiche WebLink
• M <br /> Ms. Amy Terrell <br /> Page 3 <br /> October 28,2004 <br /> wells is an overly stringent requirement for this site.Semi-annual monitoring is <br /> recommended for new monitoring wells installed at the site. Following one year of semi- <br /> annual monitoring,it is suggested that the monitoring frequency at new wells be reduced to <br /> an annual basis,consistent with monitoring frequency established in the draft MRP for <br /> other site wells. Koppel Stockton Terminal PRPs have no other comments on the draft MRP. <br /> Consistent with the monitoring schedule identified in the draft MRP, annual monitoring <br /> will be performed during the third quarter of each year.The 2004 Annual Groundwater <br /> Monitoring Report will be submitted to RWQCB during November 2004. This document <br /> will present the results of annual monitoring performed in September 2004 and will present <br /> data for the additional reporting requirements identified in the draft MRP. <br /> Please contact me at 510/587-7717 if you have any questions or comments regarding these <br /> responses. <br /> Sincerely, <br /> CH2M HILL <br /> awA-/ mAtf <br /> Alexa Stamets,PE <br /> cc: Bob Mihalovich,Senior Superfund Specialist, <br /> ChevronTexaco Environmental <br /> Management Company <br /> Ozzie Morris,Cargill Fertilizer <br /> Greg Jason,Cargill Inc. <br /> Dan Munzer,Munco Inc. <br /> Ken Laconde,SCS Engineers <br /> Kirk O'Reilly,Ph.D.,Chevron Research and Technology Division <br /> Leah Goldberg,Hanson Bridgett <br /> Karen Baril,Cargill,Inc <br /> Mike Infuma,San Joaquin County Public Health Services <br /> Rita Koehnes,Port of Stockton <br /> Mick Hardin,Burlington Northern Sante Fe Railroad <br /> Karl Morthole,Morthole and Zeppetello <br /> RDD\102804_RWQCB.doc <br />