My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thanks, <br /> Melissa <br /> -----Original Message----- <br /> From: Amy Terrell [mailto:aterrell@waterboards.ca.gov] <br /> Sent: Wednesday, August 25, 2010 10:24 AM <br /> To: Buciak, Melissa/RDD <br /> Cc: Mike Infurna <br /> Subject: koppels mw work plan and schedule <br /> Dear Ms. Buciak, <br /> Thank you for providing the August 2010 Monitoring Well Abandonment and Construction Work Plan <br /> prepared by CH2M Hill for the Koppel Stockton Terminal at 2025 West Hazelton Avenue in Stockton. <br /> In this work plan, Koppel proposes to locate and destroy three shallow and one deep monitoring well <br /> that have been buried or damaged, and install one shallow and one deep replacement monitoring <br /> well. California Regional Water Quality Control Board, Central Valley Region (Central Valley Water <br /> Board) staff concur with the destruction of the damaged or buried wells (KP-5S, KP-5D, KP-10S and <br /> KP-BG-1) and with the location of the new monitoring wells (KP-10S-R and KP-4D). <br /> In the well destruction description, CH2M Hill proposes to overdrill the wells and backfill with a grout <br /> mixture. The language is not clear as to the height of the grout backfill. Since the damaged wells are <br /> in areas in which earth disturbance appears to be a regular event, the grout should extend to about <br /> three feet below the soil surface and the boring should be backfilled with earth to the ground surface. <br /> In the location of KP-5S and KP-5D, where an earth ramp has been built above the well heads, the <br /> grout should extend to about three feet below the lower predominate earth surface. <br /> Central Valley Water Board staff conditionally concur with the August 2010 Monitoring Well <br /> Abandonment and Construction Work Plan provided that the implementation is conducted to the <br /> satisfaction of San Joaquin County Environmental Health Department, and, if practical, three feet of <br /> earth fill is placed between the ground surface and the top of the grouted well bore. <br /> Scheduling: <br /> Koppel has proposed to conduct the work in September, to coincide with the annual groundwater <br /> sampling event which is to occur in the third quarter per Monitoring and Reporting Program No. <br /> R5-2004-0835. In view of San Joaquin County's limited staffing capabilities for oversight of field <br /> work, Central Valley Water Board staff suggest that Koppel schedule the monitoring well destruction <br /> and installation in early October. To maintain Koppel and CH2M Hill's efficiency in light of this <br /> suggestion to schedule the work in early October, Central Valley Water Board staff agree to permit <br /> Koppel to conduct the annual monitoring event in October instead of September, and will allow the <br /> Annual Report to be delivered by 30 November 2010. In considering this extension of the third <br /> quarter sampling period, Central Valley Water Board staff assume that early October will continue to <br /> be representative of the dry season. <br /> Koppel may combine the well destruction and installation reports with the Annual Report which shall <br /> be due 30 November 2010, if the monitoring well work is scheduled for early October. <br /> Thank you for providing the means to destroy the damaged well, providing suitable replacement <br /> wells, and considering this suggestion to schedule the work in October. A copy of the Work Plan is <br /> attached for your convenience. If you have any questions, you may contact me by telephone at (916) <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.