My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Infurna [EH] <br /> From: Melissa.Buciak@CH2M.com <br /> Sent: Wednesday, August 25, 2010 3:52 PM <br /> To: aterrell@waterboards.ca.gov <br /> Cc: Mike Infurna [EH] _ <br /> Subject: RE: koppels mw work plan and schedule <br /> Amy, �/X/-�-��a( <br /> 165 <br /> Thank for your quick response in reviewing the work plan. X <br /> With regards to the overdrilling of the wells, it is our intent to overdrill the total depth of the wells and <br /> pressure grout to three feet below the soil surface and the boring will be backfilled with earth to the <br /> ground surface. <br /> I will revise the work plan and send it to you shortly. <br /> Per our discussion, I will discuss the schedule change with our PRPs and we will do our best to <br /> accommodate San Joaquin County's limited staffing capabilities for oversight of field work. <br /> Thank you, <br /> Melissa <br /> Melissa Buciak I Associate Geologist <br /> CH2MHILL 12525 Airpark Drive I Redding, CA 196001 <br /> Office: 530.229.3392 1 Fax: 530.339.3259 1 Mobile: 530.949.8451 <br /> -----Original Message----- <br /> From: Amy Terrell [mailto:aterrell@waterboards.ca.gov] <br /> Sent: Wednesday, August 25, 2010 10:24 AM <br /> To: Buciak, Melissa/RDD <br /> Cc: Mike Infurna <br /> Subject: koppels mw work plan and schedule <br /> Dear Ms. Buciak, <br /> Thank you for providing the August 2010 Monitoring Well Abandonment and Construction Work Plan <br /> prepared by CI-12M Hill for the Koppel Stockton Terminal at 2025 West Hazelton Avenue in Stockton. <br /> In this work plan, Koppel proposes to locate and destroy three shallow and one deep monitoring well <br /> that have been buried or damaged, and install one shallow and one deep replacement monitoring <br /> well. California Regional Water Quality Control Board, Central Valley Region (Central Valley Water <br /> Board) staff concur with the destruction of the damaged or buried wells (KP-5S, KP-5D, KP-10S and <br /> KP-BG-1) and with the location of the new monitoring wells (KP-10S-R and KP-4D). <br /> In the well destruction description, CH2M Hill proposes to overdrill the wells and backfill with a grout <br /> mixture. The language is not clear as to the height of the grout backfill. Since the damaged wells are <br /> in areas in which earth disturbance appears to be a regular event, the grout should extend to about <br /> three feet below the soil surface and the boring should be backfilled with earth to the ground surface. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.