My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:47:42 PM
Creation date
1/31/2020 4:02:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br /> additional investigation is proposed at the former bagging plant,as described in the next <br /> section. <br /> This report provides the following information: <br /> • Background of the Koppel Stockton Terminal(Section 1.0) <br /> • Rationale and description for the ten-year sampling event(Section 2.1) <br /> • Rationale and description for the proposed investigation at the former bagging plant <br /> near Monitoring Well KP-3(Section 2.2) <br /> • Schedule for the soil and groundwater sampling activities to be conducted at the site <br /> (Section 3.0) <br /> • A list of references used in preparing this work plan(Section 4.0) <br /> 1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.