My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:47:42 PM
Creation date
1/31/2020 4:02:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I INTRODUCTION AND BACKGROUND <br /> 1 .3 Work Plan Organization <br /> This work plan is organized as follows: <br /> • Section 1.0 presents the background of the Koppel Stockton Terminal and the objectives and <br /> organization of this work plan. <br /> • Section 2.0 presents the rationale and approach for destroying monitoring wells KP-4, KP-4D,and KP-61). <br /> • Section 3.0 identifies the anticipated schedule for monitoring well destruction and subsequent <br /> reporting. <br /> • Section 4.0 lists the references used to prepare this work plan. <br /> 1-2 RDD/140100001(14 M4947.DOC%) <br /> ESIW81311472IX D <br />
The URL can be used to link to this page
Your browser does not support the video tag.