My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:47:42 PM
Creation date
1/31/2020 4:02:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NUMBER WELL NUMBER <br /> 144002.KP.35 KP-SS SHEET 1 of 1 <br /> WELL COMPLETION DIAGRAM <br /> PROJECT: Koppel Stockton Terminal LOCATION: 30 ft N of E-W Burlington Northern&Santa Fe Line _ <br /> DRILLING CONTRACTOR' Spectrum Exploration <br /> DRILLING METHOD AND EQUIPMENT USED: Hollow Stem Auger-CME 75 <br /> WATER LEVELS: -7.34'msl (7113(98) START: 10:30 a.m.4/27/99 END: 12:00 p.m. LOGGER: Paxton <br /> 4- <br /> 3 <br /> 31d \ 2 1\ 1-Ground elevation at well 2.56"n-sl <br /> 2-Top of casing elevation 2.34'msl <br /> 3a— fl j55 3-Wellhead protection cover type 10"chdstie box <br /> a)drain tube? NA <br /> y�J b)concrete pad dimensions 18" <br /> 4-Dia./type of well casing 4"sch.40 PVC casing <br /> 6. <br /> 1111- 9' 5-Type/slot size of screen 4"sch.40 PVC,0.020"slot size <br /> 22' 6-Type screen fitter No.3 Sand(8 x 20 sieve) <br /> 4 -- a)Quantity used 8 bags <br /> 7-Type of seal 318"Bentonite pellets <br /> a)Quantity used 75 lbs. <br /> 5 8-Grout <br /> a)Grout mix used Cement-bentonite grout mixture <br /> b)Method of placement Pour-shallow <br /> c)Vol.of well casing grout 6 cubic fl. <br /> Development method Surge,bail&pump <br /> 0' 6 <br /> Development time 3hours <br /> Estimated purge volume 250 gallons <br /> Comments Drilled to 22 feet.Surged 15 minutes,bailed 25 gallons. <br /> Pumping level of water table about 15 fl bgs,flow rate about 2.5 qpm. <br /> Developer notes that wells in the Port of Stockton area generally <br /> don't clean up below turbidity levels of 70.Final turbidity=60. <br /> 1o.7s• <br /> ODIMpmjZl1 002\"Ildlagmms KP-5S.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.