Laserfiche WebLink
1 Approximate SiteHazelton Avenue <br /> Property Line <br /> Denitrification <br /> Test Plot C <br /> 0 75 FEET <br /> Trench 2 SCALE IS APPROXIMATE <br /> x <br /> Proposed Truck -K—X <br /> Turnaround <br /> TG-1 <br /> KP-1 R <br /> TG-2 <br /> KP-6D <br /> TG-3 Stormwater Pond <br /> (Seasonal <br /> Ponding Area) <br /> Legend: <br /> Monitoring Well <br /> (Shallow) <br /> - Monitoring Well <br /> (Deep) <br /> • Poplar Grove Piezometers FIGURE 2 <br /> Existing Poplar Grove TEST GROVE 1 <br /> -K-W New Trees PLANTING LOCATION <br /> KOPPEL STOCKTON TERMINAL <br /> STOCKTON,CALIFORNIA <br /> nnP-aozFHe <br /> CH2MHILL <br />