My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
3500 - Local Oversight Program
>
PR0545272
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:00:35 PM
Creation date
1/31/2020 4:32:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545272
PE
3528
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
02
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIROT64ENTAL HEALTH(l DEPARTMENT <br /> °' N ° SAN JOAQUIN COUNTY <br /> i �y Donna K. Heron, R.E.H.S. Unit Supervisors <br /> < Director 304 East Weber Avenue;Third Floor <br /> � Carl Bergman,R.E.H.S <br /> .� Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> p.,. _ p• Program Manager Douglas <br /> q�;FORN <br /> Telephone: (209)468-3420 Douglas W.Wilson, <br /> Fax: (209) 464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ .Jeff Carruesco, R.E.H.S. <br /> I <br /> BENETO,INC. <br /> P O BOX 980220 ' <br /> WEST SACRAMENTO CA...95798 <br /> RE: 10842 S.HARLAN ROAD Site Code: 0001685 <br /> FRENCH CAMP `! <br /> WORK PLAN: Soil and Groundwater Assessment Investigation - 1 <br /> DATED: March 22, 2006 <br /> PREPARED BY: California Geophysical Group,Inc. <br /> APPROVED: - [X103/28/06 <br /> DISAPPROVED: [ 1 - <br /> ADDENDUM NEEDED: [ ] Submit by: <br /> t <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [HSS 25296.10(c)(3)]: - R <br /> 1. To Install,develop,and sample 3 groundwater Monitoring Wells. j <br /> 2. To analyze soil and groundwater for TPH-Diesel and BTEX. <br /> 3. To survey the MWs and determine groundwater flow direction. <br /> COMMENTS AND CONDITIONS: , <br /> 1. A permit application and associated fees must be submitted to END by May 1,2006. <br /> 2. The proposed scope of work must be completed by June 1,2006. <br /> 3. A report of finding,with conclusions and recommendations,must be submitted to END and - ) <br /> J CVRWQCB by August 1,2006. n <br /> DATED )I2 O I O b BYi' �M�( <br /> Harlin Knoll,Senior RENS(2091468-3442 <br /> i <br /> i <br /> Cc: Ramos Oil Company 4 <br /> Califomia Geophysical Group,Inc. II <br /> i <br /> 6 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.