Laserfiche WebLink
T% J <br /> M88168D <br /> June 1990 <br /> merit and purge water will be containerized in DOT- <br /> requirements. Well deve}.op hos hate detergent <br /> a1Wel drums pending receipts of the analytical results. Sampling <br /> - approved 55-g will be decontaminated with a non-P P prior to first T <br /> equipment (soil and water) will f <br /> followed by a tap water rinse and two distilled water rinses p <br /> wash, revent cross-contamination, trilling equipment will be <br /> c <br /> _ use and between each use oo cleaning. Field data logs <br /> observationsd and all <br /> be decontaminated by well to s will be prep <br /> recorded on field logs and complete boreftole/ <br /> documentation will be included in the final report. containerized, per the <br /> Soil and ground water samples will be properly <br /> n delivery to the analytical laboratory. Samples (� <br /> State Water Resources Con en iing <br /> LU FT Manual, and will i placed <br /> do um nt tion <br /> chest with artificial ice p reser <br /> will be accompanied by chain-of-custody and sample p <br /> TASK 3 _ LABORATORY ANALYSIS toluene, <br /> Six soil samples will be analyzed for TPii, benzene, <br /> lenes (BTEX) by EPA method 8240/8260 modified for <br /> ethylbenzer.».. and total xy EPA method 7421. <br /> diesel. Total lead will be analyzed for using <br /> for TPH and <br /> TEX by EPA <br /> Three ground water samples wily- be <br /> 7420 following digesalyzed tion by EPA <br /> method 524.2 and for total lead by EPA meth <br /> method 3050. in Goleta, <br /> (CCAS) <br /> required for this project. CCAS is State- <br /> es req imits below <br /> . We plan to use Coast-to-Coast Analytical Services ( applicable <br /> California, to perform the analyses <br /> certified to conduct these tests and achieves detection l <br /> action levels. <br /> w TASK 4 - REPORT PREPARATION les of a <br /> SCD will prepare and submit one draft and ffindour ingsl conclusions, <br /> docwuenting our methods of invps$6mitred to Mr. Berg for review <br /> technical report ort will b <br /> and recommendations- The draft rePoft T n <br /> and comment final rep <br /> prior to submittal of)thCentral Valley Region. D and the Regional <br /> Water Quality Control Boa ( / <br /> STORK SCHEDULE plan within two <br /> re ared to implement this technical ''ro t will require <br /> SCD is p P requiring <br /> weeks of receipt o€ approval ri SJ Dwell installati n h and sampling eearation <br /> eight weeks to complete with drilling, <br /> one week, laboratory analysis two to three weeks, and draft report preparation <br /> two-weeks-to-complete,____ <br /> �t <br />