My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012721
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
5400
>
3500 - Local Oversight Program
>
PR0545276
>
ARCHIVED REPORTS_XR0012721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:55:55 AM
Creation date
2/3/2020 8:25:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012721
RECORD_ID
PR0545276
PE
3528
FACILITY_ID
FA0004997
FACILITY_NAME
PLUG CONNECTION LLC
STREET_NUMBER
5400
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06106019
CURRENT_STATUS
02
SITE_LOCATION
5400 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SG <br /> D <br /> Site Health and Safety Plan <br /> 9 881680 <br /> November" 1989 <br /> ection <br /> be <br /> skin contact with chemicals encountered (see "Wastes" sc A PID will o <br /> in continuous use in the breathing zone and if organic vapor concentrations o£ <br /> rj 5 ppm above background are detected, Level C equipment will be donned by all <br /> -Western personnel). The <br /> personnel in the contaminated zone (SGA and Layne <br /> respirator should protect the workers from inhaled contaminants. <br /> 9 . Weather conditions have the potential to disrupt the project in that <br /> if it is raining, excavation and sampling should be postponed. It is unlikely <br /> that temperature conditions would preclude completion of the project. <br /> Temperature ranges expected to be encountered are 65°F to 95°F. If workers are <br /> F3 wearing Level G equipment and the temperature is more than 800F, workers will be <br /> }.= <br /> required to take 10 minute breaks every hour, rest in the shade and drink fluids. <br /> { Underground utilities should not be encountered, the 4-inch water <br /> t " main and electric conduit exposed in the excavation are the only subsurface <br /> utilities expected in the site area. <br /> ` E a REMEDIATION OPERATION <br /> ( , <br /> The potential for adverse health or safety risks Co the on-site <br /> workers or the immediate surrounding area are low. Concentrations of the <br /> S <br /> E„ <br /> ts at the site have been <br /> hazardous substances encountered in previous assessmen <br /> low and it .is unlikely that high concentrations will be encountered especially <br /> ! ` considering the fact that the site is outside and atmospheric dispersion of <br /> contaminants will be significant. Special arrangements for possible neighborhood <br /> evacuation should not be required. <br /> No unauthorized personnel may be permitted in the work zones during <br /> i <br /> the remediation operations. If local residents, reporters, etc. enter the work <br /> site, they should be informed that health and safety procedures have been <br /> �. established to protect both the workers and the public. 'if they refuse to leave, <br /> the local police department should be contacted. <br /> EXPOSuRC: MONITORING <br /> A PID will be in continuous use during remediation operations. The <br /> f the substances likely to be encountered (benzene <br /> ionization constants for all o <br /> E <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.