My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012721
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
5400
>
3500 - Local Oversight Program
>
PR0545276
>
ARCHIVED REPORTS_XR0012721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:55:55 AM
Creation date
2/3/2020 8:25:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012721
RECORD_ID
PR0545276
PE
3528
FACILITY_ID
FA0004997
FACILITY_NAME
PLUG CONNECTION LLC
STREET_NUMBER
5400
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06106019
CURRENT_STATUS
02
SITE_LOCATION
5400 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y .$ <br /> t+J r <br /> ( h <br /> :M!M� <br /> ' G <br /> Site Health and Safety Plan -12- 881680 <br /> ILNJ <br /> November 1989 <br /> 1SS:3t TABLE 3 <br /> PERSONNEL DECONTAMINATION <br /> Decontamination Equipment and Decontamination Process <br /> 4 <br /> Outer glove and boot removal Plastic drop cloth. Set equipment on plastic drop cloth,wash in soap solution,rinse,and <br /> dry. <br /> AJ(purifying respirator Plastic drop cloth. Lay equipment down,wash in soap solution,rinse,and dry. <br /> Hand wash Bucket 3-to 5-gallon size,and liquid hand soap. <br /> Hand rinse and dry Bucket 3-to 5-gallan size,and paper towels. <br /> c� <br /> j.� GENERAL SAFETY MEASURES <br /> Ey The following general safety procedures shall be followed by all <br /> persons entering and/or working in the designated work zones: <br /> No employee or subcontractor may be allowed on-site without <br /> "f the prior knowledge and consent of the site safety officer. <br /> Er <br /> All personnel at the site shall be advised of the site safety <br /> requirements as discussed in this plan. <br /> • All contractor or subcontractor personnel shall_ bring to the <br /> tr: attention of the site safety officer er resident project <br /> representative any unsafe condition or practice associai:ed <br /> with the work activities that they are unable to correct <br /> p.. themselves. - - - <br /> • There will be no smoking, eating, chewing gum, or drinking in <br /> the contamination zone. <br /> • Hands shall be thoroughly cleaned prior to smoking, eating, <br /> or other activities outside the contamination zone. <br /> • Team members must avoid unnecessary contamination (i.e. , <br /> walking through known or suspected "hot" zones or contaminated <br /> puddles, kneeling or sitting on the ground, leaning against <br /> potentially contaminated barrels or equipment. <br /> • Respiratory devices may not be worn with beards, long <br /> sideburns,._ or.-under_other conditions that prevent a proper <br /> seal. <br /> t <br /> f , <br />
The URL can be used to link to this page
Your browser does not support the video tag.