My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012721
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
5400
>
3500 - Local Oversight Program
>
PR0545276
>
ARCHIVED REPORTS_XR0012721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:55:55 AM
Creation date
2/3/2020 8:25:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012721
RECORD_ID
PR0545276
PE
3528
FACILITY_ID
FA0004997
FACILITY_NAME
PLUG CONNECTION LLC
STREET_NUMBER
5400
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06106019
CURRENT_STATUS
02
SITE_LOCATION
5400 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k - - <br /> SG <br /> 881688 D <br /> May 1989 -13 <br /> 13.0 GENERAL SAFETY MEASURES <br /> The following general safety procedures shall be followed by all <br /> orking in the designated work zones: <br /> persons entering and/or w <br /> or may be allowed on-site without <br /> No employee or subcontract <br /> the prior knowledge and consent of the site safety officer. <br /> All personnel at the site shall be advised of the site safety <br /> requirements as discussed in this plan. <br /> All contractor or subcontractor personnel shall bring to the <br /> attention of the site safety officer or resident project <br /> representative any unsafe condition or practice associated <br /> that they are unable to correct <br /> with the work activities <br /> themselves. t <br /> r <br /> There will be no smoking, eating, chewing gum: or drinking in <br /> the contamination zone. <br /> • cleaned prior to smoking, eating, <br /> Hands shall be thoroughly G <br /> or other activities outside the contamination zone. <br /> Team members must avoid unnecessary contamination (i.e. , <br /> aminated <br /> walking through known or suspected "hot" zones or cont <br /> puddles, kneeling or sitting on the ground, leaning against <br /> potentially contaminated barrels or equipment. <br /> • not be worn with beards, long <br /> Respiratory devices may <br /> r conditions that prevent a proper <br /> sideburns, or under othe <br /> seal. <br /> 14.0 PLAN ACCEPTANCE <br /> All personnel involved with this project are required to read this <br /> Health and Safety Plan and sign ir, the space below that they have read this plan <br /> and understand its requirements. Prior to beginning work on the first day of <br /> ct a site safety meeting to <br /> the project, the site safety officer shall conduf <br /> explain the requirements of this plan and ensure that all personnel are familiar <br /> 's <br /> with it. Site safety meetings shall be held at the beginning of each work day <br /> of the project. <br /> q <br />
The URL can be used to link to this page
Your browser does not support the video tag.