Laserfiche WebLink
05 April 1999 <br /> AGE-NC Project No. 98-0448 <br /> Page 2 of 2 <br /> 5. During the pilot tests,ground water will be pumped from the extraction well into a 20,000- <br /> gallon steel baker tank for temporary storage. Pending regulatory approval of composite <br /> analytical results, the ground water will either be discharged into the City of Stockton sewer <br /> system or hauled off-site to a proper waste disposal facility. <br /> If you have any questions or require further information,please contact our office at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> Timothy J.eAlar <br /> Project Geologist <br /> Enclosures <br /> cc: Mr. Bob Long - Sierra Lumber <br /> Advanced GeoEnvironmental, Inc. <br />