Laserfiche WebLink
• TABLE OF CONTENTS <br /> PACS <br /> 1.4. INTRODUCTION 1 <br /> 2.0. PROCEDURES 1 <br /> 21 INSTALLATION OF GROUND WATER WELLS 1 <br /> 2 1 1 Soil Sample Collection 2 <br /> 2 1 2 Equipment Decontamination 2 <br /> 213 Logging 3 <br /> 2 1 4 Ground Water Well Completion 3 <br /> 21 5 Well Survey 3 <br /> 2 1 6 Well Development Activities 3 <br /> 22 QUARTERLY MONITORING AND SAMPLING ACTIVITIES 4 <br /> 3.0. FINDINGS 5 <br /> I3 1 SOIL PROFILE 5 <br /> 32 FIELD EVIDENCE OF HYDROCARBON-IMPACTED SOIL AND GROUND <br /> WATER 5 <br /> 3 3 GROUND WATER ELEVATION AND GRADIENT 6 <br /> 34 ANALYTICAL RESULTS OF SOIL SAMPLES 6 <br /> . 3 5 ANALYTICAL RESULTS OF GROUND WATER SAMPLES 7 <br /> 4.0. DISCUSSION AND CONCLUSIONS 7 <br /> 50 RECOMMENDATIONS 9 <br /> 60. LIMITATIONS 10 <br />` FIGURES <br /> I Figure 1 -Location Map <br /> Figure 2 -Site Plan <br /> - - Figure 3 - Ground Water Elevation Contour Map <br /> Figure 4 -Approximate Extent of Dissolved,TPH-g <br /> Figure 5 - Monitoring Well Consti uction Diagy am MW-8 <br /> Figure 6 - Extraction Well Construction Diagram EW-1 <br /> TABLES <br /> Table I - Analytical Results of Soil Samples <br /> Table 2 - Ground Water Elevations <br /> Table 3 - Analytical Results of Ground Water Samples <br />