Laserfiche WebLink
TABLE OF CONTENTS . <br /> PAGE <br /> 1.0. INTRODUCTION AND SCOPE OF WORK 1 <br /> 2.0. PROCEDURES 1 <br /> 21 INSTALLATION OF GROUND WATER MONITORING WELLS 1 <br /> 2 1 1. Soil Sample Collection 1 <br /> 2 1 2 Equipment Decontamination 2 <br /> 2 1 3 Logging 2 <br /> 2 1 4 Monitoring Well Completion 3 <br /> 2 1 5 Surveying of,Monitoring Wells 3 <br /> 2 1 6 Well Development Activities 3 <br /> 22 QUARTERLY MONITORING AND SAMPLING ACTIVITIES 4 <br /> 3.0. FINDINGS 5 <br /> 31 SOIL PROFILE 5 <br /> 32 FIELD EVIDENCE OF HYDROCARBON-IMPACTED SOIL AND GROUND <br /> WATER 5 <br /> 33 GROUND WATER ELEVATION AND GRADIENT 6 <br /> 34 ANALYTICAL RESULTS OF SOIL SAMPLES 6 <br /> 35 ANALYTICAL RESULTS OF GROUND WATER SAMPLES 7 <br /> 4.0. SUMMARY AND CONCLUSIONS 8 <br /> 5.0. RECOMMENDATIONS 9 <br /> 6.0. LIMITATIONS 9 <br /> IFIGURES <br /> t <br /> FIGURE 1 Location Map <br /> FIGURE 2 Site Plan <br /> FIGURE 3 Geological Cross Section A -A ' <br /> FIGURE 4, Geological Cross Section B-B' <br /> FIGURE 5 Well Construction Diagram MW,-4 <br /> FIGURE 6 Well Construction Diagram MW-5 <br /> FIGURE 7 Well Construction Diagram MW-6 <br /> FIGURE 8 Well Construction Diagram MW-7 <br /> FIGURE 9 Relative Ground Water Elevation Map, August 1998 <br /> FIGURE 10 Relative Ground Water Elevation Map, September 1998 <br /> FIGURE I 1 Approximate Extent of Dissolved TPH-g <br /> FIGURE 12 Hydrocarbon-Impacted Soil Plume Cross Section A A ' <br />