Laserfiche WebLink
1 <br />' Mass-Volume Calculations Of Extracted Gasoline Hydrocarbons - Continued <br /> . SIERRA LUMBER- 375 West Hazelton Avenue, Stockton, CA <br /> 4. <br /> 26 May 2004 to 22 June 2004 <br /> The average analytical TPH-g concentration for this tune mterval was determined to be 1503 frg/1(05-26-04=ND<50 <br /> ,ug/l,06-03-03=3500,ug/l and 06-22-04=960,avg := 1503,ug/L) The average flow rates during this time was calculated <br /> at 0 21 inches of water or approximately 25 cubic feet per minute(table 7),the operational period was equal to 552 hours <br /> of running time <br /> C = 1503 pg/I=0 001503 kg/m' <br /> Q = 0 21 inches water = 25 ft/min <br /> t=648 hours(27 days) <br /> Converting Q to m'/hour yields <br />' Q—(25 ft/min) •(60 min/hour) •(0 0283168m'/ft)=42 48 nNhour <br /> M=C•Q • t=(0 001503 kg/m') •(42 48 m/hour)• (648 hours)=41 37 kg of gasoline <br /> Converting kg of gasoline to pounds of gasoline yields <br /> 41 37 kg of gas • 2 2046 lbs of gas/kg of gas=91 21 lbs of gasoline <br /> 91 21 lbs gas/27 days=3 38 lbs/clay <br /> Converting pounds of gasolme to gallons of gasoline yields <br /> 91 21 lbs of gas • 0 16 gal of gas/lbs of gas ; 14.6 gallons of gasoline <br /> I <br /> I <br /> I <br />