Laserfiche WebLink
SIERRA LUMBER CASE #2 Page 1 of 1 <br /> Path to Closure Plan a 16o GEOTRACKER HOME I MANAGE PROJECTS REPORTS I SEARCH I LQ92LLT <br /> SIERRA LUMBER CASE#2(706077 268 97)-MAP THIS SITE OPEN-IPEMEDIATION <br /> 375 HAZELTON AVENUE ACTIVITIES REPORT CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON,CA 95203 SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:0001644 <br /> SAN JOAQUIN COUNTY P1 lSt IC MEIPAG CASEWORKER:GARRIEL GONZ41 EZ-SUPERVISOR:ADRIENNE ELLSAESSER <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SITE CENTRAL VALLEY RWQCB(REGION 5S)-CASE#:391168 <br /> CASEWORKER:JAMES BARTON-SUPERVISOR:CORI CONDON <br /> CUP Claim#:8478 CUP Priority Assigned:C CUP Amount Paid:5943.941 <br /> CR Site ID 0:NOT SPECIFIED <br /> THIS PROJECT WAS IAST fADDIFIED BY NOEL HENOERSON ON GM 1;201511:52:58 PAA-HISTIXtV <br /> THIS SITE HAS UNAPPROVED SUBMITTALS.CLICK MFRP TO OPEN A NEW WINDOW WITH THE SU BMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan THIS vEPoSIONIS RNALAS OFN1fa015 PATH TO CLOSURE HISTORY emlayssr vsTx To cLDsuaa Pix <br /> IMPEDIMENT 1: <br /> General Cdledaconceptual site model that assesses the nature,extant,and mobility of the release r Procedural Impediment-M <br /> has NOT been tlavelapetl <br /> Sb to Rmolw lm Memt-Ste 1:-DELETESTEP COMPUMONDATE <br /> cvvu Cant notes that vertical and areal extent Of imps ted groundwater is not fully delineated; A <br /> Me <br /> vertical seew adequate to the EHE, hot someadditionallateralEelineatitn nay be required to escalate 9/J62015 <br /> I <br /> CEN. Prepare and submit a work plan to complete the lateral assessment Of impacted gmundwatez WE of <br /> w-c_o-na;,.v ann., ..n t cn we.1 In u..ro.:an., _.__ <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F:Secondary source has NOT been removed to the extant practicable r Procedural Impediment-IMM <br /> [!!n Resolvelm Meet 2-Step 1:- COMPLETION DATE <br /> mgilt,OPE remediation currently 3n operation; 3f EVE portion is not core effectiva, nay needto ''.ontinua with fust the WE portion.une 2015 VPn4TE-DPa still underway at and of IN qtr 2014, but appears to be approaching the end of 1Y11(A15._ <br /> •1-.a..nvnro.. v.ntr.r.n..n.aHn.na.m+N V:.n - <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> M.dWSpeciff.Criteria,Groundwater:The contaminant plume that exceeds water quality objectives is r Proeedurallmpediment-im <br /> NOT stable or decreasing in areal extent and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the Policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):Unknown <br /> • Nearest Surface Water Body(From Plume Boundary):>250 Feel and 51,000 Feet <br /> Soo to ReaoNe lmpedment 0-Sim1:- COMPLETION DATE <br /> ntinue x/ arrive OPE zartNia[ion and when cmlpleted, verify by poet-zamedlatlon rebound testing <br /> Tune 2015 DPD E-benzene concentration have dropped below 1000 ppb for the most Intent toe groundwater DATE <br /> mnitozlonCompletionevents. Leaving projected Cm <br /> Coletion date as 3s, but may need is add more time later far 1YJ1YN15 - <br /> ♦.I,m,nA.u.linn _..... __ <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 4: <br /> Media Specific Uteri j!aIrcleura or In I to,Indoor Ai:The site is NOT considered low-threat for r Procatlurellmpetlimant-WFD <br /> the vapor-Intruslon-tosir pathway and sitespeclfic conditions do NOT satisfy items 2a,2b,or 2c. <br /> Conditions that do not meet the policy clitoris: <br /> • TPH in the Sioattenuation Zone:2100 mgikg <br /> • Bioattenuatlon Zone Thickness:2 6 Feet and 4 10 Feet <br /> • 02 Data in Bioadenuation Zone:No 02 Data <br /> • Benzene in Groundwater:2100 pgll and<1,000 pill <br /> • Soil Gas Benzene:Unknown <br /> • Soil Gas EthylBenzene:Unknown <br /> • Soll Gas Naphthalene:Unknown <br /> Sia to Resolve sW menta-Sfe 1:-DELETE STEP COMPLETION DATE <br /> Benzene over 3000ppb, yPHq locally over 100 mg/kg: continue DPE to reduce dissolved benzene and sorbed �>L�Tap��A�p�I <br /> TPH concentrations; take confsrnmtion samples in iw acted area. 1p1J12015 <br /> Tune 2015 VPD E-benzene concentration have dropped below 1000 ppb for the moat recent two groundwater --— - - --- <br /> mnitnr�nnn.rwnev..4+v:nn n.nb-ctl enanl.•mn dee... 1..hne m.v _ en .tld mo•:m=la•.. fnr <br /> ADD ADDITIONAL STEP <br /> CLOSEOUT ACTIVITIES FOR CASE IN OPEN-ELIGIBLE FOR CLOSURE <br /> WTE mEXi1FIED RP NOT FlL1l1nX PUSUC COMMENT u-T_LV CTION LLDE9 ION Wluffl EP09aL "No... a RO!i•• <br /> ��f a"1511 � 1� <br /> 'Date Identifietl for Closure is the date the case status changetl to"Open-Eligible for Closure" <br /> '•Site Closure Date is the date the case status changed to'Completed-Case Closed" <br /> ------------ <br /> Save Form as PaMallY Completed Save Farm as Cam tete <br /> �R HELP <br /> HELg CONTACT GE CYT C�73Ai YEPTCACTT L)FG OT LTRAf A_L•KFR HFI P <br /> LOGGED IN AS HENDERSONN <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp... 6/11/2015 <br />