My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:22:54 AM
Creation date
2/3/2020 9:23:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sierra Lumber Case 2 page.2 of 2 <br /> 375 Hazelton Ave. September 26„2013 <br /> The Remediation Report indicates 5 wells (DPE-1, DPE-2, DPE-3, DPE-4, and MW-9) are all <br /> currently being utilized to extract soil vapor and groundwater. The EHD approves AGE's <br /> recommendation in the Remediation Report to continued DPE operation utilizing the most <br /> impacted wells (DPE-1, DPE-3, and DPE-4). The continued operation of the DPE system during <br /> the last year has affected the water table in the source area. A decrease of approximately 3 <br /> feet of the water table has been observed and reported. The EHD recommends applying a <br /> higher induced vacuum and a higher groundwater removal rate to DPE-1 and evaluate any <br /> influences 3 feet way at the point of MW-15. At this time, MW-15 should remain a monitoring <br /> point during the active DPE remediation. If your consultant disagrees, please have them submit <br /> a technical justification for incorporating MW-15 into the DPE system. <br /> If you have questions regarding this directive, please contact Harlin Knoll at (209) 468-3442 or <br /> by email at hknoll(a)sicehd.com. <br /> Sincerely, <br /> Harlin Knoll, REHS Nuel C. Henderson, Jr., PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> CC: Mr. James L. L. Barton, PG, California Regional Water Quality Control Board Central <br /> Valley Region, 11020 Sun Center Drive, Suite 200, Rancho Cordova, CA 95670 <br /> Tim Cuellar, AGE, 837 Shaw Road, Stockton, CA 95215 <br />
The URL can be used to link to this page
Your browser does not support the video tag.