My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:05:07 AM
Creation date
2/3/2020 9:24:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Preliminary Site Investigation Work Plan <br /> SIERRA LUMBER MANUFACTURERS (CASE 2) <br /> ' 375 West Hazelton Avenue, Stockton, California <br /> TABLE OF CONTENTS <br /> ' SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> ' 2.1. PREVIOUS INVESTIGATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I <br /> 2.2. REGIONAL GEOLOGIC/HYDROGEOLOGIC SETTING . . . . . . . . . . . . . . . . . 2 <br /> ' 2.4. GROUND WATER DEPTH AND FLOW DIRECTION . . . . . . . . • • 2 <br /> 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.1. PRE-FIELD WORK TASKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.2. SOIL AND GROUND WATER SAMPLE COLLECTION AND ANALYSIS . . 3 <br /> 3.3. MONITORING WELL INSTALLATION, DEVELOPMENT AND SURVEY . 5 <br /> 3.4. GROUND WATER SAMPLING AND ANALYSIS . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.5. PREPARATION OF REPORT OF FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> ' 4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.1. SOIL BORING ADVANCEMENT AND SAMPLING . . . . . . . . . . . . . . . . . 55 <br /> 4.2. WELL COMPLETION AND WELL ELEVATION SURVEY . . . . . . . . . . . . . .t 7 4.3. WELL DEVELOPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 4.4. GROUNDWATER SAMPLING PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4.1. Static Water Lcvel Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4.2. Well Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.4.3. Sample Withdrawal . . <br /> 4.4.4. Sample Handling . . .INATI . . • • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> p <br /> 4.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT . . . . . . . . . . 8 <br /> 5.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> ' FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 -Site Plan (with proposed boring locations) <br /> Figure 3 -Proposed Well Design <br /> ' Advanced GeoEnvironmental,Inc. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.