My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003583
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
ARCHIVED REPORTS_XR0003583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:07:42 AM
Creation date
2/3/2020 9:26:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003583
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Monitoring Well Installation Work Plan <br /> SIERRA LUMBER MANUFACTURERS (Case#2) <br /> 375 West Hazelton Avenue, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2 1 PERMITTING AND PRE-FIELD WORK ACTIVITIES 1 <br /> 22 DRILLING AND SOIL SAMPLE COLLECTION 2 <br /> 23 MONITORING WELL INSTALLATION, DEVELOPMENT, <br /> AND SURVEY 2 <br /> 24 GROUND WATER SAMPLING AND ANALYSIS 3 <br /> 25 PREPARATION OF REPORT OF FINDINGS 3 <br /> 3.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3 1 PILOT SOIL BORING 3 <br /> 32 WELL COMPLETION AND ELEVATION SURVEY 4 <br /> 33 WELL DEVELOPMENT 5 <br /> 34 GROUNDWATER SAMPLING PROCEDURES 5 <br /> 35 EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT 5 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Well Construction Diagram Shallow <br /> Figure 4 - Well Construction Diagram Deep <br /> APPENDICES . <br /> Appendix A - Site Background Information <br /> • <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.