Laserfiche WebLink
SOIL REMEDIATION PLAN <br /> HOLLY SUGAR CORPORATION <br /> i <br /> Within 24 hours of excavation of contaminated soils, one composite sample will <br /> be taken from the soil pile and analyzed for TPH-gas by EPA method 8015 per the <br /> LUFT manual. The cogposite sample will consist of one sample taken from the <br /> center of each of 4 equal sectors of the soil pile. <br /> Each sample will be taken from at least 3 inches below the surface of the pile using <br /> a driven-tube sampler, capped and sealed with inert materials and extruded in the <br /> lab; or by using a clean brass or stainless steel tube, at least 3 inches long, driven <br /> into the soil. The ends of the tube will be covered with aluminum foil, AND <br /> plastic end caps, AND wrapped with tape. The samples will be transported on-ice <br /> to the lab. <br /> Chain of custody records shall be kept to document possession of the samples from <br /> the time they are taken in the field until they are analyzed. <br /> After the hydrocarbon content of the soil is determined, the soil will be aerated <br /> accordingto Rule 4651 Table 1 . A copy of the lab results will be sent to the <br /> District aong with notification that aeration has begun. <br /> The aerated soils will be sampled monthly for TPH-gas until hydrocarbons are <br /> reduced to safe levels as specified by the Department of Health Services. <br /> I <br /> i <br />