My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:30:46 PM
Creation date
2/3/2020 10:00:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. J. Catholic Cemetery Chronology <br /> Page 2 <br /> 05/20/98 Date of Problem Assessment Report and Corrective Action Plan providing <br /> the remedial design for an SVE/AS system_ and detailing the installation of <br /> MW6 and MW7. <br /> 06/02/99 Date operation of the SVE/AS system began. <br /> 06/24/00 Date EHD concurred with removal.of the SVE/AS system. . <br /> Approximately 7000 pounds of gasoline was removed from the subsurface <br /> and treated during-the operational period- <br /> 08/24/00 CPT1 and CPT-lA were drilled this date to confirm the effectiveness of <br /> the SVE/AS system. <br /> 11/28/00 Date of the Environmental Site Investigation Report documenting the <br /> 41 <br /> results of a sensitive receptor survey and the drilling of CPT-1 and CPT- <br /> IA, <br /> 2/26102- CPT IB and CPT2 through CPT6 were drilled and MW8A(screened 30-50 <br /> 3/5/02 feet) and MW8B (screened 55-75 feet) we'r'e installed during this time. <br /> 05/02/02 Date of Report, Additional Site Investigation that documents the February <br /> through March 2002 work. <br /> L <br /> 01/18/03 Date monthly batch extraction of groundwater from MW-5 and MW-7 <br /> began. <br /> 07/10/04 Final batch extraction of groundwater was completed on this date. <br /> Approximately 16,710 gallons of groundwater, with low levels of <br /> 'contaminant concentration,were removed using the batch extraction <br /> method. <br /> 1 <br /> 12/21/05 Date EHD staff met with CVRWQCB staff to discuss closure of the site. <br /> 07/28/06 Date of the Site Conceptual Model and Request for Case Closure. If <br /> 12/20/06 Date of the addendumto the Case Closure Report: Tier 1 Environmental <br /> Screening Levels for.Closure Justification. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.