My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:30:46 PM
Creation date
2/3/2020 10:00:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i, N <br /> Mr. Vigil -2- October 29, 2003 ` <br /> F <br /> i <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> Although I have referred to the Ramage Environmental proposal in my pre-approval above, <br /> please be aware that you will be.entering into a private contract: the State of California <br /> cannot compel you to sign any spe!3cific contract. <br /> ii <br /> I also want to remind you that the Fund,'s regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified:firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> y <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Re uest Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed: Please insure that your consultant prepares their <br /> invoices to include the required breakdown of-costs on a time and materials basis, that a <br /> invoiced tasks are consistent with the'priginal proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> a subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the regulatory agency. <br /> E: E! F <br /> Please call if you have any questions; I can be reached at(916)341-5796. <br /> Sincerely, <br /> C 1y <br /> Mark Owens, Water Resources Control:Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> i <br /> cc: tHarlin Knoll <br /> San Joaquin Environmental Health <br /> 304 East Weber Avenue, 3r1.'Fl66r <br /> Stockton, CA 95202-2708 <br /> ij <br /> z <br /> Joseph Ramage <br /> I <br /> Ramage Environmental i it <br /> P.O.. Box 869 <br /> Rancho Murieta, CA 95683 .r j <br /> i' E2 <br /> California Environmental Protection Agency k <br /> �,�Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.