Laserfiche WebLink
• ��Pf rx <br /> _ • 1f PPN* <br /> Pete Wilson <br /> Tl P Governor <br /> February 25, 1998 <br /> State Water <br /> Resources <br /> Control Board <br /> Division of San Joaquin Catholic Cemetery <br /> Clean Water P O Box 1137 <br /> Programs Stockton, CA 95201 <br /> Mailing Address: <br /> P.O.Box 944212 PRE-APPROVAL OF CORRECTIVE ACTION COSTS,CLAIM NO. 1092, <br /> Sacramento,CA <br /> 94244-2120 SITE ADDRESS: HARDING WAY& CEMETERY LN, STOCKTON, CA 95204 <br /> 2014 T Street, <br /> Suite 130 1 have reviewed your request, received on February 23, 1998, for pre-approval of corrective action <br /> Sacramento,CA costs. I will place these documents in your file for future reference. I have included a copy of the <br /> 95814 z�-6010 "Cost Pre-Approval Request" form. Please use this form in the future for requesting pre-approval of <br /> FAX(916)227-4530 corrective action costs. <br /> World Wide Web <br /> http://www.swrcb.ca. With the following pre- pp p provisions,the total cost a roved for completing the December 17' 1997, <br /> govt--cwphomel Ramage Environmental workplan approved by the San Joaquin County EHD (County)in their January <br /> fundhome.htm 29, 1998 letter, is $17,860; see the table below for a breakdown of costs. Upon completion of each <br /> phase of work,you are required to submit the results to the County and the Fund for reviews. ole: <br /> costs associated with investigating,monitoring,and remediating non-petroleum contaminants, i.e., <br /> carbon disulfide and 1,2-DCA, are not eligible for funding. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved <br /> in this letter. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br /> new scope of work. ' <br /> • Although I have referred to the Ramage Environmental proposal in my pre-approval above,please <br /> be aware that you will be entering into a private contract: the State of California cannot compel <br /> you to sign any specific contract. This letter pre-approves the costs as presented in the proposal <br /> dated February 11, 1998 by Ramage Environmental for conducting the work approved by the <br /> County for implementing the December 17, 1997, Ramage Environmental workplan. <br /> All future costs for corrective action must be approved in writing by Fund staff. Future costs for <br /> corrective action must meet the requirements of Article 11, Chapter 16, Underground Storage Tank <br /> Regulations. <br /> y Our mission into preserve and enhance the quality of California's water resources,and <br /> a' Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br />