Laserfiche WebLink
: fly- I' S � CI <br /> Iola% <br /> S II soR <br /> Cal/EPA k: Pete Wils'on <br /> S Governor'� <br /> February 25, 199$ <br /> State Water <br /> Resources <br /> Control Board E! I <br /> San Joaquin Catholic Cemetery Division of q .. 2 <br /> Clean Water P O.Box 1137 a <br /> Programs Stockton, CA 95201 <br /> i4 <br /> Mailing Address: M <br /> P.O.Box 944212 0 <br /> Sacrarhento,CA PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 1092, <br /> 94244-2120 SITE ADDRESS: HARDING WAY& CEMETERY LN, STOCKTON, CA 95204 <br /> 2014 T Street, F <br /> Suite 130 I have reviewed your request,,received on February 23, 1998, for pre-approval of corrective action <br /> Sacramento,CA costs. I will place these documents in your file for future reference. I have included a copy of the <br /> 95814: << �' <br /> Cost Pre-Approval Request":forin. .Please use this form in the future for requesting pre-approval of <br /> (916)727-6010 Y <br /> FAX(916)227-4530 corrective action costs. <br /> M <br /> worldwide web .With the followingrovisions;'.the total cost pre-approved for completing the December 17 1997 <br /> http:llwww.swrcb.ca. p p pp p g ' ' <br /> govt--cwphorne/ Ramage Environmental workplainapproved by the San Joaquin County EHD (County) in their January <br /> fundhome.htm. 29, 1998 letter, is $17,860; seethe;table below for a breakdown of costs. Upon completion of each <br /> phase of work,you are required to submit the results to the;County and the Fund for reviews. te: <br /> costs associated with investigating,monitoring, and remediating non-petroleum contaminants, i.e., <br /> carbon disulfide and 1,2-DCA not eligible for funding:' <br /> Be aware that this pre-approval dbes not constitute a decision on reimburseinent: all reasonable and ' <br /> necessary corrective action costs for work directed and.approved by the County will be eligible for <br /> reimbursement per the terms of your Letter of Commitment,at costs consistent with those pre-approved I ' <br /> E <br /> in-this letter. <br /> • The.actual costs and scope of:'Work performed must bc',consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> _ p P h' g <br /> Boards * <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br /> new scope of work. Y` j <br /> • Although I have referred to the Ramage Environmental proposal ii-1 my pre-approval above,please <br /> be aware that you will be enteririg into a private contract: the State of California cannot compel <br /> you to sign any specific contract. This letter pre-approves the costs as presented in the proposal <br /> dated February 11, 1998 by Ramage Environmental for conducting the work approved by the <br /> County for implementingthelDecember 17, 1997,Ramage Environmental workplan. <br /> All future costs for corrective action must be approved in"writing by Fund staff. Future costs for <br /> corrective action must meet the�requirements of Article 14 Chapter 16, Underground Storage Tank i <br /> Regulations. <br /> Our mission is fo'preserve and enhance the quality of Californias water resources,and <br /> �� Recycled Paper ensure their proper allocation and efficient use for the benefit o_f preseni and future generations. <br />