Laserfiche WebLink
0 <br /> TABLE 'I nttrtued) ' <br /> CUMULATIVE GROUNDWATER MONITORING DATA <br /> San Joaquin Catholic Cemetery, Stockton <br /> WELL TOTAL TOP OF WELLHEAD DEPTH TO GROUNDWATER <br /> DATE DIAMETER DEPTH SCREEN ELEVATION DATE GROUNDWATER ELEVATION <br /> IWELLID INSTALLED (Inches) (Feet BGS) (Feet BGS) (Feet MSL) MONITORED (Feet BGS) (Feet MSL) <br /> MW-7 04/28/1998 2 60 30 1824 05/01/98 4211 -2387 <br /> 08/07/98 41 30 -2306 <br /> 11/05/98 4219 -2395 <br /> 02/18/99 3938 -2114 <br /> 05120!99 3758 -1934 <br /> 08/26/99 4021 -2197 <br /> 11112!99 4157 -2333 <br /> 02/17/00 4024 -2200 <br /> 05/19/00 3745 -1921 <br /> 08/24/00 4079 -2255 <br /> 11/09/00 4191 -2367 <br /> 02/17/01 4068 -2244 <br /> 05/18/01 4052 -2228 <br /> 07/30/01 4346 -2522 <br /> 11/01/01 4672 -2848 <br /> 2023 03/28/02 4288 -2265 <br /> 05121/02 1 4367 -2344 <br /> 08122102 48 17 -2794 <br /> MW$A 03/19/02 2 50 30 1669 03/28/02 3943 -2274 <br /> 05/21/02 4026 -2357 <br /> 08122/02 4488 -2819 <br /> MW-8B 03/19/02 2 75 55 1651 03/28/02 3928 -2277 <br /> 05/21/02 4014 -2363 <br /> 08122102 4505 -2854 <br /> Notes Original wellhead elevation survey based on an arbitrary datum taken from USGS 7 5-minute West Stockton Quadrangle Map <br /> On May 1 1998,the wellhead elevations were re-surveyed to an existing benchmark by Morrow Land Surveyors <br /> In April 2002 the wellhead elevations were re surveyed to an existing benchmark by Morrow Land Surveyors <br /> Feet MSL=Feet relative to mean sea level <br /> NA'=Not Available Wellhead elevation compromised due to modification for SVE system <br /> NA =Not Available Wellhead elevation not initially surveyed <br /> NM'=Nat Monrtored Wellhead elovation compromised due to modification for SVE system <br /> NMZ=Not Monitored Well buried or area flooded <br /> NM1=Not Monitored Well blocked by downhole remediation equipment <br /> NM'=Not Monitored Well was dry <br />