My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002794
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:26:42 PM
Creation date
2/3/2020 10:21:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002794
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESULTS OF VENT-ROI ANALYSIS <br /> . EFFECTIVE RADIUS CALCULATION FOR CONVENTIONAL SOIL VAPOR EXTRACTION SYSTEM <br /> San Joaquin Catholic Cemetery site in Stockton, California <br /> Fresh Gasoline (contaminant mixture, volatile and biodegradable) <br /> 1og10 (MW P*) = 2. 45 - 3 . 97 bm <br /> Temperature Constant = 1904 deg K <br /> Liquid Density = .7 g/cc 1 <br /> Zero Order Bioremediation Rate Constant = 8. 6 ppm/day <br /> Initial Total Soil Contaminant Concentration = 12000 ppm <br /> Residual (Non-degradable) Soil Concentration = 1 ppm <br /> Vertical wells in 8 inch boreholes, extending to groundwater, <br /> screened from 10 to 30 feet <br /> Thickness of Vented Soil Interval = 20 feet <br /> Slope of log10 (P) vs Distance from Pilot Test = . 015 per ft <br /> Soil Gas Temperature = 64 deg F <br /> Applied Vacuum = 82 in. water column <br /> Air Flow Rate per Vapor Extraction Well = 13 .6 scfm <br /> Desired Time to Cleanup = 1095 days <br /> Cleanup Goal = 99 % removal <br /> VOLATILIZATION: SINGLE WELL EFFECTIVE RADIUS = 6. 8 FEET <br /> INSUFFICIENT SURFACE INFILTRATION FOR MULTIPLE WELL SYSTEM <br /> BIODEGRADATION: SINGLE WELL RADIUS OF INFLUENCE = 20. 12 FEET <br /> INSUFFICIENT SURFACE INFILTRATION FOR MULTIPLE WELL SYSTEM <br /> VOL. PLUS BIO. : SINGLE WELL EFFECTIVE RADIUS = 20. 12 FEET <br /> INSUFFICIENT SURFACE INFILTRATION FOR MULTIPLE WELL SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.