Laserfiche WebLink
RESNA SITE SAFETY PLAN <br /> Job Name: SAN JOAQUIN CATHOLIC CEMETERY <br /> Job Location: HARDING WAY AND CEMETERY LANE <br /> ' Client Name: MR. AL VIGIL <br /> Project Number: 150041.01 Date: MAY 20, 1994 <br /> SSP Prepared by: Lois Frantz <br /> Site Safety Officer: Lois Frantz or Field Geologist <br /> ' This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br /> ' employees during all phases of site operations. The SSP must be reviewed and signed by <br /> all on-site employees, subcontractors, and visitors prior to entering the site. General safe <br /> work practices are identified in the RESNA Injury and Illness Prevention Manual and apply <br /> ' to all RESNA work sites. <br /> The provisions set-forth in this SSP shall apply to RESNA Industries Inc. (RESNA) <br /> employees and any subcontractors working for RESNA at the job site. All personnel <br /> working for RESNA at the job site must read this SSP, and sign the attached Compliance <br /> Agreement before entering the work area. Field personnel may deviate from the safety <br /> ' provisions set-forth in this SSP, but only to upgrade or increase the safety requirements. <br /> RESNA personnel may suspend work if unauthorized modifications to the safety provisions <br /> set-forth in this SSP are made. If unsafe working conditions develop or changes in site or <br /> ' working conditions require changes in safety procedures, appropriate amendments to this <br /> SSP will be provided by the RESNA project manager or supervisor, with the written <br /> approval of a RESNA branch safety officer or the RESNA Health and Safety Director. <br /> ' FACILITY BACKGROUND <br /> ' Soil and groundwater contamination due to leaking underground storage tanks (gasoline). <br /> ' sicc-ssP PAGE I <br /> MAY 1994 <br />