Laserfiche WebLink
1 <br /> RESNA SITE SAFETY PLAN <br /> ' Physical Hazards <br /> Tasks} Hazard Mitigation Measure <br /> 2 Heavy Equipment (Nose & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in <br /> 1 accordance with recognized Industry standards <br /> and Cal-OSHA Title 8, Subchapter 4, <br /> Construction Safety Orders In addition, an <br /> exclusion zone applies to all personnel The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig Personnel <br /> will not be allowed under booms or augers at <br /> any time <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> ' will be supplied with ear protection <br /> 2 Dust The dust hazard will be mitigated by not <br /> allowing ground crew to be located down wind <br /> ' of drilling and excavation activity In addition, <br /> water will be applied to control the dust if <br /> visible levels of dust are generated <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site Keep sources of ignition away from these materials <br /> Flammable (Flash Point <I00 IF) Combustible (Flash Point <200 °F) <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> ' During tasks 2, and 3, a multipurpose dry chemical fire extinguisher will be located within 15 feet of <br /> all site activities <br /> ' SJCC-SSP PAGE 4 MAY 1994 <br />