My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002802
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:46:48 PM
Creation date
2/3/2020 10:24:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002802
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tsampling,p g, latex gloves will be worn to prevent cross <br /> contamination with other samples. One pair of disposable <br /> gloves will be dedicated to each sample collected. <br /> Once the sample is collected, each end of the cylinder will <br /> ' be sealed with aluminum foil or teflon tape and then capped <br /> with a polyethylene lid, taped, and labeled. The sample <br /> will then be individually sealed in a ziplock bag and <br /> ' immediately placed in an ice chest containing dry ice or <br /> frozen chemical ice for delivery to a state certified <br /> laboratory. Sample identification, storage and <br /> transportation will be conducted as outlined in the previous <br /> section. <br /> 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> ' Soil samples will be collected and transported from <br /> excavated material in the manner described in the previous <br /> ' section, however, a backhoe will not be utilized. If <br /> composite samples are collected, four brass cylinders will <br /> be collected for every 50 cubic yards of material to be <br /> sampled unless otherwise specified by the lead regulatory <br /> t agency. The samples will be composited by the state <br /> certified analytical laboratory personnel prior to testing. <br /> ' 12.0 Groundwater Sampling Protocol <br /> Prior to arriving at the sampling site, all sampling <br /> equipment will be washed with laboratory grade detergent, <br /> and rinsed twice with tap water, once with acetone, and once <br /> with deionized water. This procedure will be carried out <br /> on-site before sampling of other monitoring wells, if more <br /> ' than one well is to be sampled with the same sampling <br /> device. <br /> ' Immediately prior to sampling, the depth to water (DTW) in <br /> the well will be recorded. The thickness of product on top <br /> of the groundwater, if present, will be measured using an <br /> Interface probe. The procedure for monitoring is presented <br /> ' in Section 9.0 (Groundwater Monitoring Protocol) . <br /> If free product is detected, analysis of groundwater at the <br /> interface for dissolved product will, not be conducted. A <br /> product sample will be collected for source identification. <br /> If all free product cannot be removed, an interval specific <br /> ' sampling device may be utilized to collect a sample from <br /> below the zone of free product. Before collecting at least <br /> two groundwater samples from each well, the well will be <br /> purged until indicator parameters (temperature, conductivity <br /> ' and pH) stabilize. This will entail the removal of at least <br /> four well casing volumes by bailing or pumping. The <br /> criteria for determining well casing volumes and temporary <br /> storage of purged water is outlined in Section 10.0, (Well <br /> Development Protocol ) . The indicator parameter measurements <br /> will be taken both before and after purging of each well <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.