Laserfiche WebLink
RESNA SITE SAFETY PLAN <br /> WORK PLAN <br /> ' Task One: Workplan <br /> Task Two: Monitor and survey the existing monitoring well and the facility <br /> (irrigation) well to attempt to establish groundwater gradient and <br /> direction. <br /> ' Task Three: Drill two soil borings to 80 feet below grade, completing them as monitoring <br /> wells. <br /> Task Four: Develop, monitor and sample wells. <br /> Task Five: Report <br /> SJCC-SSP PAGE 2 FEBRUARY 1992 <br />