Laserfiche WebLink
All site activities involving potential contact with hazardous materials associated with this <br /> investigation will be conducted in accordance with the site Health and Safety Plan (Appendix <br /> III} <br /> ' REPORTING <br /> A summary report will be prepared in accordance with Regional Water Quality Control Board <br /> guidelines, detailing the findings of the investigation <br /> PROPOSED SCHEDULE <br /> ' Following agency approval, the estimated time necessary to complete the tasks proposed in this <br /> workplan is 15 weeks The distribution of tasks proposed for each time period is shown below <br /> 1 Actual time may vary depending on drill ng availability, laboratory turn-around-time and <br /> unforeseen field conditions <br /> 1 <br /> TASK WEEK <br /> 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 <br /> ' Agency Approval <br /> Mobilization/Permits ««r r««««r r««««• <br /> ' Soil Sormw <br /> Well Installation ww«wwwwwwww««ww««« <br /> ' Surveying •r«««««««« <br /> Soil AnalySLs wwrr««««r«r««««««« <br /> ' Well Development/ <br /> Water Sampling r«««r««« <br /> Water Analysis .««w««.•«+«w*«««• <br /> ' Internal Review/ <br /> Report Preparation «««««w«w«««w«w«««rr«wwww«w«www««ww <br /> ' Report Submittal <br /> to Agency r <br /> R-021492 LF 8 <br /> t <br />